Test Name |
Hybrid
Results (Freiburg) |
Module Results |
Comment |
Long Term Test |
N/A |
PASS |
|
FullBypassTest | PASS |
PASS | |
RedundancyTest |
PASS | PASS | |
Pipeline Test |
PASS | PASS | |
StrobeDelay | PASS |
PASS |
|
ThreePointGain |
PASS (9 bad channels) |
FAIL (21 bad channels) | 12 added bad channels - in specs
for prequalification |
TrimRangeScan |
FAIL |
FAIL |
1 untrimmable channel - already
in a hybrid |
ResponseCurve |
PASS (9 bad channels) |
FAIL (21 bad channels) | 12 added bad channels - in specs for prequalification |
NO | PASS |
PASS |
|
TimeWalk | PASS |
PASS |
|
IV Curve | PASS |
PASS |
Power cable shielded by Al foil connected to VME crate skeleton in point near module (using Cu thick wire), insulate from other modules, module box ungrounded
Signal cables 3m, recommended type
all adding bad channels.......
Test Name |
Hybrid
Results (Freiburg) |
Module Results |
Comment |
Long Term Test |
N/A |
PASS |
|
FullBypassTest | PASS |
PASS | |
RedundancyTest |
PASS | PASS | |
Pipeline Test |
PASS | PASS | |
StrobeDelay | PASS |
PASS |
|
ThreePointGain |
PASS (10 bad channels) |
FAIL (40 bad channels) | bondwires damaged during
cleaning at MPI |
TrimRangeScan |
PASS |
PASS |
|
ResponseCurve |
PASS (10 bad channels) |
FAIL (40 bad channels) | bondwires damaged during
cleaning at MPI |
NO | PASS |
PASS |
|
TimeWalk | PASS |
PASS |
|
IV Curve | PASS |
PASS |
Power cable shielded by Al foil un-connected to VME crate skeleton, insulate from other modules, module box ungrounded
Signal cables 5m, recommended type
all adding bad channels.......